Le Vieux Pont
A wooden bridge spanned the Dranse, providing the only main passage between the two banks.
Regularly washed away by river floods, it was decided in the 1720s to build a solid stone bridge. During construction, another flood washed out the work in 1725. The bridge was finally operational in 1729.
The Morzine Heritage Map is available free of charge from the Tourist Office. Additional information is available by scanning the flashcodes associated with each monument.
Every week in season, a heritage guide also offers a guided tour.
Themes
Location details
- Mountain location
- Resort centre
opening
| Opening hours from 01 January to 31 December 2026 | |
|---|---|
| Monday | Open |
| Tuesday | Open |
| Wednesday | Open |
| Thursday | Open |
| Friday | Open |
| Saturday | Open |
| Sunday | Open |